Permit allowing installation or alteration of an elevator, escalator, dumbwaiter, wheelchair lift, construction personnel hoist, wind tower lift, or special purpose elevator.
Code Citation IC 89A
Who Applies The owner or owner\’s agent (usually an elevator company).
When To Apply Application should be made at the time the contract is awarded to an elevator contractor and must be made at least eight weeks prior to the date the permit is needed. Work cannot begin until a permit is issued.
Initial Requirements Three sets of drawings or job specifications, the permit fee and the application are required before a permit will be issued. Specific requirements for the drawings can be found at 875 Iowa Administrative Code Chapter 71. Operation cannot begin until installations or alterations have been inspected and approved by a state inspector.
Duration When the project is completed or one year. Extensions are possible.
Processing Time Up to 8 weeks.
Fee Structure See 875 Iowa Administrative Code 71.16.
Renewal Requirements Does not pertain.
Exam Does not pertain.
Additional Information Visit our web site for more details.
Services Provided
Service Category
- Service SubCategory
Matthew Mitchell
150 Des Moines Street
Des Moines, IA 50309
(515) 281-5415
[email protected]
Are you Matthew Mitchell? Update your profile
Send Yourself a Magic Link
Enter the email address associated with your profile (*****@iwd.iowa.gov) and we'll send you a link by email that will sign you in instantly! The magic link email will be sent to the manager email address on file.